This project consists of preparing the design of a “Flyover” bridge over the intersection of PR-1, PR-169, and PR-8834 in Guaynabo. In addition, geometric and safety improvements will be made to the intersection as part of the Project. Relocations of potable water pipes and the existing electrical system will also be included, and lighting will be added to the intersection.
Client:
Puerto Rico’s Infrastructure and Financial Authority (PRIFA)
Services:
Roadway Design
Transportation Design
Structure
Acquisitions
Drainage
Utilities
Traffic Signals
Bridge Design
Post Design
Location:
Guaynabo, Puerto Rico
Year:
2018
Budget:
$800,000