![](https://omprc.com/media/2023/02/Osceola-and-Poinciana-Boulevard-Ramp-Toll-Facility-2021-07-28-11-scaled.jpg)
The scope of work involves the necessary infrastructure modifications to support the All-Electronic Tolling (AET) conversion for the Osceola Parkway Mainline and Poinciana Boulevard Ramp Toll Facilities and the deployment of ITS systems along Osceola Parkway.
![](https://omprc.com/media/2023/02/Osceola-and-Poinciana-Boulevard-Ramp-Toll-Facility-2021-07-28-2-scaled.jpg)
![](https://omprc.com/media/2023/02/Osceola-and-Poinciana-Boulevard-Ramp-Toll-Facility-2021-07-28-18-scaled.jpg)
Services to be performed include Signing and Pavement Markings to support the AET conversion between the limits and the installation of an Intelligent Transportation System (ITS) inclusive of a fiber optic network (FON) trunkline, Dynamic Message Sign (DMS) subsystem, and Closed-Circuit Television (CCTV) subsystem along Osceola Parkway from the interchange with Interstate 4 to Dyer Boulevard and along SR 535 (Kissimmee Vineland Road) from south of Kyng’s Heath Road to south of Polynesian Isle Boulevard.
Client:
Osceola County Board of County Commissioners
Services:
Highway Design
Transportation Structures
TEO
Water Resources
Location:
Osceola County, Florida
Budget:
$8 Million (Design-Build Contract)